School playgrounds and outdoor learning spaces
Outdoor spaces built for the Thai climate: play structures, safety surfacing, shade, sports areas and long jump pits, installed while students are away.

Who we work with
Heads of early years and PE
You set how each area is used. We plan play value, sports markings and outdoor teaching space around your curriculum.
Bursars and business managers
A fixed quote after the audit and a phased plan if you want to start with one area, such as shade or surfacing.
Facilities managers
One contractor for groundworks, drainage, surfacing, shade and equipment.
Architects and landscape designers
Equipment layouts, fall zones and surfacing build-ups early in the design of a new campus.
Safety and design considerations
We match the safety surfacing to the fall height of each piece of equipment. On site we check ground levels and drainage, sun paths for shade, existing trees and services below ground, sight lines for staff on duty, and how close play areas sit to roads, car parks and buildings.

What is included
Site plan
Separate areas for each age group, clear fall zones and planned routes for staff on duty.
Play structures
Climbing, slides and balance trails chosen for each age group.
Safety surfacing
Wet-pour rubber, rubber tiles or artificial grass matched to fall height.
Shade structures
Shade sails, canopies and covered walkways for the hot season.
Sports areas
Courts, running tracks and long jump pits for PE and sports days.
Early-years play
Low-level play, sand and water areas and outdoor classrooms.
Specifications
- Play equipment
- Climbing, slides or balance equipment for each age group
- Safety surfacing
- Wet-pour rubber, rubber tiles or artificial grass, matched to the fall height of each piece
- Shade
- UV-resistant shade fabric or fixed canopies on engineered steel posts
- Sports surfaces
- Hard-wearing court surfaces with line markings for the sports you teach
- Drainage
- Sub-base and drainage designed for heavy rain, so surfaces dry quickly after storms
- Age groups
- Separate equipment and areas for early years, primary and secondary
- Warranty
- 2 years on workmanship. Equipment, surfacing and shade fabric carry the manufacturer's warranty.
What you can choose: playground components
Every project gets a fixed quote after the free Facilities Audit.
Play structure
Climbing, slides or balance equipment for one age group
Safety surfacing
Wet-pour rubber, rubber tiles or artificial grass with shock pad
Shade structure
Shade sail or fixed canopy over play or seating areas
Multi-use sports court
Sports surface, line markings and goals or posts
Long jump pit
Pit with sand, edging, run-up and take-off board
Full playground project
Groundworks, drainage, surfacing, equipment and shade
How a project runs
Free audit and brief
We check levels, drainage, shade and machinery access on site.
Site plan and fixed budget
Site plan or 3D concept and budget range within 30 days.
Sign-off and order
Equipment, surfacing and shade ordered.
Build in the holiday
Groundworks, drainage, equipment, shade and surfacing while students are away.
Handover
Walkthrough of the finished area with your team.

Wellington College International School Bangkok 
Wellington College International School Bangkok 
Wellington College International School Bangkok
Related guides
Costs and budgeting · 6 min read
What Does a School Renovation Cost? Budget Drivers in Thailand
What drives the cost of school labs, D&T workshops, food rooms, libraries and playgrounds in Thailand, and how to build a budget.
Planning and timelines · 6 min read
Planning a Summer Lab Upgrade: From Budget to Handover
A stage-by-stage plan for upgrading school science labs in the summer break: audit, design, budget approval, ordering, installation and handover.
Common questions
How much does a school playground cost in Thailand?
It depends on the area, the equipment, the type of safety surfacing and whether shade or drainage work is needed. After the free audit you receive a budget range within 30 days, then a fixed quote. Payments follow milestones: 60% deposit on sign-off, 30% on delivery and 10% on handover.
Can you add shade to an existing playground?
Yes. Shade sails and canopies can usually be added without replacing the play equipment. We check post positions against fall zones and underground services first.
Can the work be done during term time?
Small jobs such as a long jump pit or a single shade sail can be done over weekends or half-term breaks with the area fenced off. Larger projects with groundworks are best done in the summer holiday.
What warranty do you give?
Workmanship is covered for 2 years, and equipment, surfacing and shade fabric carry the manufacturer's warranty.
Other spaces we build
Start with a free Facilities Audit
Our designer visits, measures the room and sends a 3D concept, a budget range and the furniture range that fits it. No obligation.