Costs and budgeting · 6 min read
What Does a School Renovation Cost? Budget Drivers in Thailand
What drives the cost of school labs, D&T workshops, food rooms, libraries and playgrounds in Thailand, and how to build a budget.
By Charleston Education Team · Published

The cost of renovating a school space in Thailand depends mostly on three things: how many services the room needs (gas, water, extraction, electrics), where the furniture comes from, and how much building work sits behind the finishes. A library refresh with local finishes is at the lower end. A full science lab with imported furniture, gas and fume cupboards is at the higher end.
This guide does not quote prices. Every school building is different, and we can only give a fixed number after a site visit, so every Charleston project gets a fixed quote after a free Facilities Audit.
Cost drivers by project type
The table assumes a single room or area in an existing building. New-build projects and multi-room suites behave differently.
| Project type | Typical scope | What drives the cost | How to keep it down |
|---|---|---|---|
| Science lab | Island or perimeter benches, gas, water, electrics, worktops, storage, optional fume cupboard | Number of student places, gas and water to each bench, fume cupboards, imported benching | Keep sinks and gas close to existing services; mix imported benches with local storage |
| D&T workshop | Workbenches, machine positions, dust extraction, three-phase power, storage | Dust extraction, three-phase power, machine safety controls | Reuse existing power routes; repeat one bench unit across the room |
| Food technology lab | Cooking stations, sinks, cookers, extraction, demonstration area | Number of cooking stations, gas or induction, cooker extraction | Repeat one station layout; plan stations along existing drainage |
| Library and flexible furniture | Shelving, reading areas, flexible tables and seating, lighting | Amount of shelving, lighting and power, flooring | Keep sound shelving; phase the work zone by zone |
| Playground | Play equipment, safety surfacing, shade, sports markings | Area, type of safety surfacing, shade structures, drainage | Phase the equipment; size surfacing to the play zones that need it |
Time on site depends on the scope and the building. Design, approvals and furniture ordering come before it, and for imported furniture the order is often the longest part of the programme.
What drives the cost
Services
In specialist rooms, services are the biggest single cost driver.
- Gas means a new supply, pipework to each station, isolation valves and certification. Labs and food rooms often need it; libraries never do.
- Every sink needs a water supply and a drain. Running new drainage across a concrete slab means cutting and making good, which adds cost and time.
- Fume cupboards in labs, dust extraction in D&T workshops and cooker extraction in food rooms all need ducting, fans and often a route through the building fabric.
- Electrics cover bench sockets, machine supplies, three-phase power for workshop machines, emergency stops and lighting. An older building may need a distribution board upgrade first.
A room that already has services in roughly the right places costs much less to refit than one where everything has to move.
Furniture origin and shipping
Imported lab and workshop furniture, such as the SB Labs (UK) and BFX (Australia) ranges, is designed for many years of school use, and it adds shipping cost and lead time. SB Labs is the premium option and the specification many British-curriculum schools know. We also offer our own range, sourced from manufacturers in China and Thailand, as the value option. Many schools mix them, for example UK island benches with our own range for storage, and the free audit recommends the mix that fits your budget.
Site access
- Can a truck reach the building? Is there a lift, or will materials go up stairs by hand?
- Is the room on an upper floor, with drainage that has to run through the ceiling below?
- Are other parts of the school in use during the works?
Difficult access adds labour time, which adds cost.
Summer timing
Most schools want the work done in the summer break, when students are away. Many schools want the same few weeks, so planning ahead gives you more choice of install dates and time to order furniture; a rushed order can mean air freight or a lower specification.
VAT and import duties
Ask every contractor whether their price includes VAT at the current Thai rate, and whether import duties and customs clearance on imported furniture are included. Two quotes can look very different simply because one includes these and the other does not.
Building condition
Older buildings can hide weak slabs, old wiring, leaking pipes and asbestos-containing materials. A proper survey before design brings them out before they turn into surprises on site.
How to build a budget your board will approve
Bursars and business managers usually need a number months before the work starts. These steps give you a figure you can defend.
- List the rooms and the scope, specifically: "two chemistry labs with fume cupboards", not "upgrade science".
- Get a site survey of services, access, building condition and room sizes.
- Get a 3D concept design, so staff and governors agree what they are paying for.
- Get an itemised budget, with furniture, services, building work, finishes, design fees, VAT and import costs as separate lines.
- Add contingency. We suggest [X]% for refurbishment of existing buildings, where hidden conditions are more likely. Your quantity surveyor may advise a different figure.
- Once the design is signed off, ask for a fixed quote rather than a rate-based estimate.
- Agree payment milestones. Our own terms, for example, are a 60% deposit on sign-off, 30% on delivery and 10% on handover.
Budget template
Use these lines to check that every quote covers the same scope.
| Line | What to check |
|---|---|
| Design and survey | Measured survey, 3D concept and services design are included |
| Furniture (imported) | Range, quantities and worktop material are named |
| Furniture (local) | Materials and finishes are specified, not "or equal" |
| Services: gas, water, drainage | Routes from the existing supply, and certification |
| Services: electrics and data | Bench outlets, machine supplies and any board upgrade |
| Extraction and ventilation | Ducting route, fans and testing on handover |
| Building work and finishes | Floors, ceilings, lighting and making good |
| Shipping, import duties and clearance | Stated as included or excluded |
| Contingency ([X]%) | Held by the school, released only for agreed changes |
| VAT | Shown as a separate line |
| Total | A fixed figure, valid for a stated period |
Refurbishment or new build?
The cost drivers above are for refitting rooms in an existing building. A new campus or science block works differently.
Gas, water, drainage and extraction can be planned into the structure from the start instead of cut into existing floors and walls, so services are easier to route. Lab and workshop furniture is usually a separate package, often bought directly by the school or through a specialist alongside the main building contract. Your architect, services engineer and furniture supplier need to agree positions early.
On a new build, ask for furniture and services pricing at the concept design stage, so the budget is realistic before tender.
Ways to reduce cost without cutting quality
- Plan the layout around existing water and drainage where you can.
- Phase the work: one lab this summer and the next the following summer, to the same design.
- Mix imported and local furniture, and spend on the parts that take the most wear (worktops, benches, fume cupboards).
- Repeat the same bench and storage units across several rooms to cut design and ordering cost.
- Order early to avoid rush shipping and get more choice of install dates.
Questions to ask every contractor
- Is the price fixed, and what would change it?
- Are VAT, import duties and shipping included?
- Who designs the services, and are they qualified for gas and electrics?
- Which standards does the furniture meet?
- What is the defects period and the warranty on furniture?
- Can you show completed school projects we can visit or speak to? See our project case studies.
- Do you provide reporting in English and Thai?
For a science-specific view of timing, read Planning a Summer Lab Upgrade: From Budget to Handover.
Get a number for your school
Your board will want a figure for your own building. A free Facilities Audit gives you an on-site walk-through, a 3D concept and a budget range with a project plan, with no obligation to proceed.
Related service: Science Labs

About the author: Charleston Education Team
The Charleston Education team designs, supplies and installs science labs and learning spaces for international schools across Thailand, working with SB Labs (UK), BFX (Australia) and our own furniture range.